Build To-do List

From SaintsRobotics

Jump to: navigation, search

Contents

Build To-do List

This page displays the build team's objectives by date and priority. The schedule should be effectively met unless serious complications arise.

Current Project

  • Cut slots in the wood of the secound tier for the gearboxes.
  • Drill holes in the secound tier for the wires.
  • Cut pillars to support the secound tier.
  • Find/build the 2 other gearboxes.
  • Assemble lower tier.
  • Assemble upper tier.
  • Double check electronics.
  • Hand over to Ankur.

Next Project

Once the 4-omniwheel chassis is built, the Build team will start construction on a 4-wheel tank drive. Each of the four wheels will be powered, and two chains will link the motors.

  • Draft concept
    • Includes attaching two front motors to the robot, whether there will be gearboxes or not, and how the chain will be regulated.
  • Adapt 2007 chassis to new design.
  • Check electronics.
  • Attach motors and link them with the gears.
  • Test robot.
  • Hand robot to Ankur.

Meeting Times

The current time-frame requires meeting every day from June 5th to The end of the school year!!.

Materials Needed

  • Metal Pillars for construction of 2nd tier.
  • Chassis metal from 2008 robot

Subgroup Integration

Will require Developers to program the chassis. Might require creative use of joysticks.

Personal tools